Port Said East Electric Power Plant
East Delta Electricity Production Co .
Co .
2 Units of Steam Turbines, Each of ( 2 X 341.25 M.W), All of 682.5 M.W Installed Capacity, Dual Firing (Mazzot, NG), Commercial operation date 2003.
The Plant Is Under The BOOT System & It Will Be Delivered To East Delta Co. in 2028.
Description
4983
· Generated Energy ( G .W. h )
Statistics 2012/2013
N.A
· Transmitted Energy ( G .W. h )
· Fuel Consumption ( g.m / K.W.h )
· Peak Load ( M.W )
· Load Factor ( % )
· Capacity Factor ( % )
· Thermal Efficiency ( % )
· Availability ( % )