Port Said East Electric Power Plant 

East Delta Electricity Production Co .

Co .

2 Units of Steam Turbines, Each of ( 2 X 341.25 M.W), All of 682.5 M.W Installed  Capacity, Dual Firing (Mazzot, NG), Commercial operation date 2003.

The Plant Is Under The BOOT System & It Will Be Delivered To East Delta Co. in 2028.

Description

4983

   Generated  Energy ( G .W. h )

Statistics  2012/2013

N.A

   Transmitted  Energy ( G .W. h )

N.A

   Fuel Consumption ( g.m / K.W.h )

N.A

   Peak Load ( M.W )

N.A

   Load Factor ( % )

N.A

    Capacity  Factor ( % )

N.A

    Thermal Efficiency ( % )

N.A

    Availability  ( % )