El Walidia Electric Power Plant

Upper Egypt Electricity Production Co .

Co .

2 Units of Steam Turbines, Each of 312 M.W, All of 624 M.W Installed Capacity  Fuel Firing ( Mazzot), Commercial operation date 1992-1997.

Description

3540

   Generated  Energy ( G .W. h )

Statistics  2012/2013

3408

   Transmitted  Energy ( G .W. h )

238.8

   Fuel Consumption ( g.m / K.W.h )

545

   Peak Load ( M.W )

74

   Load Factor ( % )

65

    Capacity  Factor ( % )

36.7

    Thermal Efficiency ( % )

82.6

    Availability  ( % )