Back to the Map

El Walidia Electric Power Plant

Upper Egypt Electricity Production Co .

Co .

2 Units of Steam Turbines, Each of 312 M.W, All of 624 M.W Installed Capacity  Fuel Firing ( Mazzot), Commercial operation date 1992-1997.

Description

3540

·   Generated  Energy ( G .W. h )

Statistics  2012/2013

3408

·   Transmitted  Energy ( G .W. h )

238.8

·   Fuel Consumption ( g.m / K.W.h )

545

·   Peak Load ( M.W )

74

·   Load Factor ( % )

65

·    Capacity  Factor ( % )

36.7

·    Thermal Efficiency ( % )

82.6

·    Availability  ( % )