Upper Egypt Electricity
Production Co .
|
Co
.
|
2 Units of Steam Turbines , Each of 627
M.W, All of 1254 M.W Installed Capacity Dual Firing( Mazzot , NG ),
Commercial operation date
1997-1998.
|
El Kuriemat
St |
Description
|
2 Units of Gas Turbines , Each of 250 M.W. + One Steam Turbine of
250M.W, With Total Installed Capacity of 750
M.W, Dual Firing( Solar , NG ), Commercial operation date
2007-2009. |
El Kuriemat
CC1
|
2 Units of Gas Turbines , Each of 250 M.W + One steam turbine of
250 M.W ,With Total Installed Capacity of 750 M.W, Dual Firing( Solar , NG ),
Commercial operation date 2009
- 2011.
|
El Kuriemat
CC2
|
Solar Share of 20 M.W, Thermal Share 120 MW, With Total Installed
Capacity
140 M.W, Dual Firing( Solar , NG ), Commercial operation date 2011.
|
El Kuriemat
Solar
|
El Kuriemat Solar |
El Kuriemat CC2 |
El Kuriemat CC1 |
El Kuriemat St |
· Generated Energy ( G .W. h )
|
Statistics
2012/2013 |
237 |
4396 |
3991 |
8784 |
228 |
4308 |
3916 |
8577 |
· Transmitted Energy ( G .W. h
|
-- |
170.8 |
160.7 |
214.9 |
· Fuel Consumption (g.m / K.W.h) |
-- |
796 |
781 |
1275
|
· Peak Load ( M.W )
|
-- |
63 |
58 |
79
|
· Load Factor ( % )
|
-- |
67 |
61 |
80 |
· Capacity Factor ( % )
|
-- |
51.4 |
54.6 |
40.8 |
· Thermal Efficiency ( % )
|
-- |
88.3 |
89.1 |
95.2 |
· Availability ( % )
|
|
|