Assiout Electric Power Plant

Upper Egypt Electricity Production Co .

Co .

3 units of steam turbines , Each of 30 M.W, All of 90 M.W Installed Capacity      Fuel Firing ( Mazzot ), Commercial operation date 1966-1967.

Description

461

   Generated  Energy ( G .W. h )

Statistics  2012/2013

420

   Transmitted  Energy ( G .W. h )

306.7

   Fuel Consumption ( g.m / K.W.h )

74

   Peak Load ( M.W )

71

   Load Factor ( % )

59

   Capacity  Factor ( % )

28.6

   Thermal Efficiency ( % )

78.3

   Availability  ( % )