West Delta Electricity Production Co .
|
Co .
|
4 steam turbines , Each of 150 M.W + One steam
turbine of 311 M.W with Total
Installed Capacity of 911 M.W, Fuel used ( Mazzot , N.G ),
Commercial operation date 1983-1984 -1991.
|
Abu kir
|
Description
|
One gas turbine of Installed Capacity 24.27 M.W
, Fuel used ( Solar , N.G ) Commercial operation date 1983 .
|
Abu Kir (G)
|
2 steam turbines , Each of 650 M.W with Total
Installed Capacity of 1300 M.W, Fuel used ( Mazzot , N.G ),
Commercial operation date 2012-2013.
* commercial
operation for unit 6 on 12/2012 and unit 7 on 6/2013.
|
New Abu Kir
|
New Abu Kir
|
Abu Kir (G)
|
Abu kir
|
· Energy
Generated
(G. W. h )
|
Statistics 2012/2013 |
5106 |
-- |
5185 |
4885 |
-- |
4881 |
· Energy Transmitted
( G .W. h )
|
214.5 |
-- |
249.9 |
· Average Fuel Consumption
( g.m / K.W.h )
|
650 |
-- |
811 |
· Peak Load ( M.W )
|
77 |
--
|
73 |
· Load Factor ( % )
|
77 |
-- |
63 |
· Capacity Factor ( % )
|
41.1 |
-- |
35.1 |
· Thermal Efficiency ( % )
|
92 |
-- |
79 |
· Availability ( % )
|
|
|
|
|
|
|