Construction Companies
Introduction: |
||||||||||||||||||
The company was founded in August 1965 which
is registered in the Egyptian construction and building contractors and
the company is engaged in acts of civil works and electrical
installations inside and outside the Republic of Egypt , Egypt |
||||||||||||||||||
Contact data: |
||||||||||||||||||
|
|
|||||||||||||||||
Fields of work: |
||||||||||||||||||
|
Execution of Electric Power Station Projects up to capacity of 600 MW. |
|||||||||||||||||
|
The establishment and installation of over head transmission line and transformer stations with 220/66, 66/11 KV and high voltage cables , extra high voltage cables up to 500 KV. |
|||||||||||||||||
|
Execution of the low-voltage networks, lighting and motive power for irrigation, agriculture and environmental industries |
|||||||||||||||||
|
The implementation the works installations of electrical, mechanical and civil works projects for the petroleum, industrial and irrigation and drainage projects, and others.. |
|||||||||||||||||
|
The implementation the works studies and research and designs for projects |
|||||||||||||||||
|
Import and export of tools and equipment necessary for the works which intervention in the purposes of the company, establishment necessary workshop for them . |
|||||||||||||||||
Previous work: |
||||||||||||||||||
|
Replacement of insulators string of the 500 kV over head transmission line of High Dam / West of Aswan |
|||||||||||||||||
|
Establishment 500 kv over head transmission line in Egypt in Sidi Kriir |
|||||||||||||||||
|
Modification of Abu Zabal / El Tebin and Abu Zabal / Suez 500 kV (OHTL) over head transmission line amounted 5.6 million pounds. |
|||||||||||||||||
|
Establishment many 220 KV over head transmission line such as (EL negila /Sidi barany), (Ras El hekma/ marsa matrouh) , (salwa/wadi EL naqra), feed lines transformer station, the Tenth of Ramadan City. |
|||||||||||||||||
|
More than 50 project (OHTL) over head transmission line in Egypt amounted to 200 million pound |
|||||||||||||||||
|
More than 40 (66K.V. cable projects ) which amounted more than 50 million pound such as (El sheikh zaid/Abou rawash), (El sheikh Zaid/ smart village) |
|||||||||||||||||
|
More than 65 projects 66 kV( OHTL) over head transmission line in Egypt which amounted more than 80 millions pound such as lines (Salwa/wadi EL naqra) , ( Marsa matrouh, EL negila) |
|||||||||||||||||
|
Establishment over head transmission line in (Algeria, Sudan, Morocco, Libya and Saudi Arabia) with investments more than 65 million pounds. |
|||||||||||||||||
|
More than 30 transformer Substations in different operating voltage with investment more than 85 million pounds such as (west Cairo substation with capacity 2*25 M.VA.,220/66/11 K.V, (sadat city substation and the Tenth of Ramadan City substation) 220/66/11 K.V |
|||||||||||||||||
|
Establishment Medium and Low voltage lines with investment more than 320 million pounds such as the line (Abou zaabal in Aapour city 11K.V. , electrical network for golf hotel in Sharm El-Sheikh, distribution networks and buildings Mobarak Academy, electrical grids cities of the Burj El Arab and Domiett. |
|||||||||||||||||
|
The establishment of industrial projects with investments of more than 100 million pounds. |
Introduction: |
||||||||||||||
Is one of the
companies specialized in construction projects, electric power stations,
high and extra high voltage transmission networks. |
||||||||||||||
Contact data: |
||||||||||||||
|
|
|||||||||||||
Fields of work: |
||||||||||||||
|
Establishment and installation of power stations either thermal or hydro or wind farms in additional to buying and transport the necessary equipment to the site. |
|||||||||||||
|
Design and installation transformer Substation of different voltages up to 500 KV. |
|||||||||||||
|
Design and installation Overhead transmission lines up to 500 KV and also laying under ground cables to 220 KV. |
|||||||||||||
|
Connecting the electric current for villages lighting , street lighting and so on.., |
|||||||||||||
![]() |
Transportation and loading for heavy equipment up to 300 ton and length upto 180 cm . |
|||||||||||||
Previous work: |
||||||||||||||
|
Establishment Aswan 2 hydro-electric power station (4X75 M.W). |
|||||||||||||
|
Rehabilitation of High Dam hydro-electric power station (12 X175 MW) |
|||||||||||||
|
Rehabilitation power station of Damanhour (3x15 + 3x65 M.W) and Assiut (3x30 M.W). |
|||||||||||||
|
Establishment five substations 220/66/11 kV for delta area amounted about 12.5 million pounds , Three substations 132/66/11 kV for Upper Egypt amounted about 1.5 million pounds and thirty eight substations 66/11 kV in different areas amounted 94.5 million pounds.. |
|||||||||||||
|
Changing insulators of the 500 kV transmission line from Aswan High Dam to Cairo (1000 km). |
|||||||||||||
|
Establishment Over head transmission lines, double circuits, 2200 km of 220 kV, 200 km of 132 kV , 1300 km of 66 kV and 500 km of 33 kV. |
|||||||||||||
|
Underground cables with joints, 98 km of 66 kV including 8.3km marine cables to cross the Nile river. |
|||||||||||||
|
Installation of equipment for Rural electrification projects for some Governorates in Egypt such as Aswan, Kafr El sheieh and dakahliea.. |
|||||||||||||
|
The supply and installation tasks of low and medium voltage equipment and lighting for some of the new cities in Egypt such as the Badr City , the tenth of Ramadan , Sixth of October , the El shrouk, new Domietta and new BeniSuef In addition to the port of Dekheila . |
|||||||||||||
|
Establishment of civil works, infrastructure and installation of towers Zafarana wind power generation farm |
|||||||||||||
|
Supply and erection Many (diesel and gas generating power) stations of various capacities in different locations. |
|||||||||||||
|
Supply and erection of mechanical and electrical equipment for many industrial projects. |
Introduction: |
||||||||||||||||||
KAHROMIKA is one of the
specialized company in the field construction of electrical
and mechanical projects and the company was founded in 1971.
The company enlisted the services of a group of highly
qualified engineers, accountants and administrators who had
Acquired extensive experience from projects appertaining to
the power sector such as power plants and transmission
networks |
||||||||||||||||||
Contact data: |
||||||||||||||||||
|
|
|||||||||||||||||
Fields of work: |
||||||||||||||||||
|
Installations of mechanical and electrical work of (power stations - transformer stations - electricity transmission lines - cable - industrial projects, etc.); |
|||||||||||||||||
|
Works of manufacture of iron products (structural columns – manufactures iron – tanks) in company’s factory in Mstorod . |
|||||||||||||||||
|
Storage tanks with different capacity. |
|||||||||||||||||
|
Welding large diameter pipes. |
|||||||||||||||||
Previous work: |
||||||||||||||||||
|
Establishment National Energy Control Center |
|||||||||||||||||
|
Installation of the mechanical and electrical plants (Kafr Al-Dawar - line - north of Cairo - creams - Sidi Krir - Nubariya - Ayoun of Moses - Abu Qir - Damietta plant capacity of 6 × 150 MW). |
|||||||||||||||||
|
Installation of the mechanical and electrical great Toshka tlomba project |
|||||||||||||||||
|
Supply and erection connection line between Tabrq /Salom in the Republic of Libya 220KV |
|||||||||||||||||
|
Supply and design of towers and Implementation works and installation for connection line between Sharm El-Sheikh / Dahab / Nuweiba / Taba |
|||||||||||||||||
|
Establishment Protection system projects for the 500 kV network in Cairo 500, Samalut, Nag Hammadi and High Dam substations |
|||||||||||||||||
|
Connection line between Siert / Agdabia 400KV. |
|||||||||||||||||
|
Establishment of Aswan / Shalatien 220KV |
|||||||||||||||||
|
Giza / Haram cables |
|||||||||||||||||
|
Establishment of Sidi krir / Nubaria 500KV. |
|||||||||||||||||
|
Extension of Nag Hammadi substation 500/132 kV. |
|||||||||||||||||
|
Establishment of Nubariya transformer substation 500/220 kV |
|||||||||||||||||
|
Establishment of 1200 Kms of 132, 66, 33 kV TL |
|||||||||||||||||
|
Establishment 98 substations of different capacities and rating in Egypt |
|||||||||||||||||
|
Establishment of 1400 k.m. of 220 kV double circuits TL with foundations |
|||||||||||||||||
|
Fabrication and supply of 60000 Tone Towers for Egypt (66,22 &11 kV); |
|||||||||||||||||
|
Fabrication and supply of 40000 Tone Towers for Lebanon (11 kV); |
|||||||||||||||||
|
Boilers for Abu Qir power station 500 Ton, Damanhour power station 300 Ton; |
Introduction: |
||||||||||||||||
The Arab
Contractors is one of the largest construction firms in the
Middle East which took it upon them selves to community
service, Providing excellent services to meet the
construction requirements of the customer and market
requirements with full responsibility to achieve sustained
growth, which ensures its place in the construction services
for years to come. |
||||||||||||||||
Contact data: |
||||||||||||||||
|
|
|||||||||||||||
Fields of work: |
||||||||||||||||
|
Installation all metal construction for power plants and installations. |
|||||||||||||||
|
Manufacture the plates to improve the power factor so that the capacity of up to 1 M. VARS. |
|||||||||||||||
|
Manufacture low-voltage distribution panels and control panels. |
|||||||||||||||
|
Manufacture of trailers electrical generators . |
|||||||||||||||
|
Manufacture of electric welding Transformers 50-600 A (DC/AC) |
|||||||||||||||
|
Manufacturing Tongar battery charger (DC / AC) up to 12 battery current |
|||||||||||||||
Previous work: |
||||||||||||||||
|
Cairo West Power Station 66 M.W; |
|||||||||||||||
|
Abu Sultan Thermal Power Station 600 M.W. |
|||||||||||||||
|
Ayoun Musa Thermal Power Station 640 M.W |
|||||||||||||||
|
Installation of Gas Turbine in Salhia (3x3.5 MW – 11 kV); |
|||||||||||||||
|
Installation of Gas Turbine in Shabab Area (4x5 MW – 11 kV); |
|||||||||||||||
|
Installation of substation in Salhia (3x20 MW); |
|||||||||||||||
|
Installation of Gas Turbine in Ayat (2x12.5 MW); |
|||||||||||||||
|
Construction metal of Korimat power plant |
Introduction: |
||||||||||||||
The company was
established since 1976 and works in the field of
high-voltage transmission lines and transformer stations and
the establishment of underground cables |
||||||||||||||
Contact data: |
||||||||||||||
|
|
|||||||||||||
Fields of work: |
||||||||||||||
|
Establishment Overhead transmission lines 400,220,66 KV and under ground cables up to 66 KV. |
|||||||||||||
|
Establishment of Substation projects in different capacities . |
|||||||||||||
|
The provision of HV (high voltage) equipment. |
|||||||||||||
|
The company's
activities are concentrated in the trade as an agent: |
|||||||||||||
Previous work: |
||||||||||||||
|
Mechanical and electrical works for one of the air forces Base- engineering Authority of the armed forces. |
|||||||||||||
|
Establishment 220 K.V. overhead transmission line (O.H.T.L.) Korimate /Bani Swaif (E.E.A.). |
|||||||||||||
|
Establishment of 10th Ramadan transformer substation.(66/22 KV). |
|||||||||||||
|
66 K.V. Zakazik transformer substation |
|||||||||||||
|
Establishment 220 K.V overhead transmission line (O.H.T.L.) Algeria (Bishr/ Ain sefarat ). |
|||||||||||||
|
Supply 66KV Cable at canal Zone |
|||||||||||||
|
Establishment 220 K.V. overhead transmission line (O.H.T.L.) 33 K.V Central region – Saudi Arabia. |
|||||||||||||
|
Establishment medium and low voltage networks for lighting (7500 Feddans) in beet sugar village project. |
|||||||||||||
|
Electrical. Power supply of Ramsis Hilton – Cairo |
|||||||||||||
|
Electrical. Power supply of El Salam Hospital - Cairo |
|||||||||||||
|
Microwave communication network project – Armed forces |
Introduction: |
||||||||||||||||
The
company was founded in 1998 and is a
subsidiary of Alkan It is a company
specialized in The establishment and
construction, management and operation and
maintenance of infrastructure networks and
communications networks and networks of
power plants in cooperation with the rest of
the group companies. |
||||||||||||||||
Contact data: |
||||||||||||||||
|
|
|||||||||||||||
Fields of work: |
||||||||||||||||
|
Establishing diesel power plant with capacities from l MW to 30 MW in cooperation with the rest companies of the group. |
|||||||||||||||
|
Manufacturing, supply and installation of metal towers for connected power project and communication networks. |
|||||||||||||||
|
The establishment and construction of stations and telecommunications networks, and satellites. |
|||||||||||||||
|
Maintenance and operation and management of such networks and stations. |
|||||||||||||||
Previous work: |
||||||||||||||||
|
Establishment communications network and communications towers for Vodafone Egypt in all governorates of the republic. |
|||||||||||||||
|
Establishment Power Plants 3.5 MW |
|||||||||||||||
|
Establishment 4 stations 2.5 MW Power Plant |
|||||||||||||||
|
Establishment 4 stations 1.6 MW Power Plant |
|||||||||||||||
|
Establishment of more than twenty stations 0.8 MW Power Plants |