|
No |
Report |
Total of Trainees |
|
1 |
A.
Trainees working at the Holding
company |
342 |
|
B.
Trainees working at the associate
companies |
30800 |
|
2 |
Trainees working outside the company |
71 |
|
3 |
Trainees from the Arab and African companies |
|
A.
Inside Egypt* |
414 |
|
B.
Outside Egypt** |
40 |
|
4 |
Summer Training for college and High Institutes Students |
4155 |
|
5 |
Co-Classes in cooperation with the Ministry of Education:
No of graduates: |
|
A.
3 year System |
91 |
|
B.
5 year System |
27 |
|
C.
Mubarak- Cole System |
113 |
|
6 |
Training the fresh graduates |
|
A.
Trainees under training |
165 |
|
B.
Trainees who have graduated |
3822 |
|
7 |
Cooperation with Cairo University |
20 Engineers completed in post graduate studies in the field
of plotection and automatic control for the Power plants |