Installed capacity and fuel used

Comp.a

Station

No. of Units

Installed Capac. (MW)

Fuel

Commissioning Date

Cairo

Shoubra El-Kheima

Shoubra El-Kheima

Cairo West

Cairo West Ext.

Cairo South 1

Cairo South II

Cairo North

Wadi Hof

Tebbin

Tebbin*

(ST)

(G)

(St)

(St)

(CC)

(CC)

(CC)

(G)

(G)

(St)

4 x 315

1 x 35

4 x 87.5

2 x 330

3 x 110 + 4 x 60

1 x 110 + 1 x 55

2 x 250 + 1 x 250

3 x 33.3

2 x 23

3 x 15

1260

35

350

660

570

165

750

100

46

45

N.G-H.F.O

N.G-L.F.O

N.G-H.F.O

N.G-H.F.O

N.G-H.F.O

N.G

N.G-L.F.O

N.G-L.F.O

N.G-L.F.O

H.F.O

84-85-1988

1986

66-1979

1995

57-65-1989

1995

2004

1985

1979

58-1959

East Delta

Damietta

Talkha

Talkha 210

Ataka

Abu Sultan

Shabab

Port Said

Arish

Oyoun Mousa

(CC)

(CC)

(St)

(St)

(St)

(G)

(G)

(St)

(St)

9 x 125

8 x 24.2 + 2 x 45

2 x 210

2 x 150 + 2 x 300

4 x 150

3 x 33.3

1 x 21 + 1 x 23 + 1 x 20

2 x 33

2 x 320

1125

283.6

420

900

600

100

64

66

640

N.G-L.F.O

N.G-L.F.O

N.G-H.F.O

N.G-H.F.O

N.G-H.F.O

N.G-L.F.O

N.G-L.F.O

H.F.O

N.G-H.F.O

89-1993

79-80-1989

93-1995

85-86-1987

83-84-1986

1982

77-1984

2000

2000

Sharm El-Sheikh

Hurghada

(G)

(G)

2 x 23.7 + 4 x 24.7

3 x 23.5 + 3 x 24.3

146

143

L.F.O

L.F.O

--

--

Zafarana

(W)

105 x 0.6 + 117 x 0.66

140

Wind

2000-2003-2004

Suez Gulf (Boot)

Port Said East (Boot)

(St)

(St)

2 x 341.25

2 x 341.25

682.5

682.5

N.G-H.F.O

N.G-H.F.O

2002

2003

West Delta

Kafr El-Dawar

Mahmoudia

Mahmoudia

Damanhour 300

Damanhour Ext.

Damanhour (Old)**

Damanhour

El-Seiuf

El-Seiuf

Karmouz

Abu Kir

Abu Kir

Sidi Krir 1&2

Nubaria ***

Matrouh

(St)

(G)

(CC)

(St)

(St)

(St)

(CC)

(G)

(St)

(G)

(St)

(G)

(St)

(CC)

(St)

4 x 110

3 x 45

8 x 24.5 + 2 x 56

1 x 300

3 x 65

2 x 15

4 x 24.2 + 1 x 56

6 x 33.3

2 x 26.5 + 2 x 30

2 x 12.5

4 x 150 + 1 x 300

1 x 25

2 x 320

2 x 250 + 1 x 250

2 x 30

440

135

308

300

195

30

152.8

200

113

25

900

25

640

500

60

N.G-H.F.O

N.G-L.F.O

N.G-L.F.O

N.G-H.F.O

N.G-H.F.O

N.G-H.F.O

N.G-L.F.O

N.G-L.F.O

H.F.O

L.F.O

N.G-H.F.O

L.F.O

N.G-H.F.O

N.G-L.F.O

N.G-H.F.O

80-84-1986

81-1982

83-1995

1991

68-1969

1960

1985-1995

81-82-83-1984

61-1969

1980

83-84-1991

1983

99-2000

2005

1990

Sidi Krir 3&4 (Boot)

(St)

2 x 341.25

682.5

N.G-H.F.O

2002

Upper Egypt

Walidia

Kuriemat

Assiut

(St)

(St)

(St)

2 x 300

2 x 627

3 x 30

600

1254

90

H.F.O

N.G-H.F.O

H.F.O

92-1997

98-1999

66-1967

Hydro Plants

High Dam

Aswan Dam I

Aswan Dam II

Esna

Naga Hamadi

 

12 x 175

7 x 40

4 x 67.5

6 x 15

3 x 1.8

2100

280

270

90

5.4

Hydro

Hydro

Hydro

Hydro

Hydro

1967

1960

85-1986

1993

1942

*

Since 8/6/2005 El-Tebbin Steam plant (3x15M.W) has been retired.

**

Since 26/6/2005 Damanhour station old (3x15M.W) has been retired.

***

Nubaria Power plant Combined cycle project started operation test for 2 Gas units (2x250M.W) in July and August Consequently.

   