|
West Delta Electricity Production Co .
|
Co .
|
|
2 units of steam turbines , Each Of 320 M.W
Installed Capacity , Dual Firing ( Mazzot , NG ),
Commissioned 1999-2000 . |
Sidi Krir 1,2
|
Description
|
|
2 units of Steam turbines , Each of 341.25 M.W Installed
Capacity , Dual Firing ( Mazzot , NG ) , Commissioned 2002, BOOT . |
Sidi Krir 3,4
|
|
2 units of gas turbines , Each of 250 M.W
+*One steam turbine of 250M.W),
with total Installed Capacity of 500 M.W
,
Dual Firing( Solar , NG ),
Commissioned 2009.
* steam turbine is still under
construction . |
Sidi Krir
Cc |
|
Sidi Krir
Cc |
Sidi
Krir 3,4
|
Sidi
Krir 1,2
|
· Generated Energy
( G .W. h )
|
Statistics 2009/2010
|
|
3140 |
4759
|
4527.3 |
|
3080.3 |
N.A
|
4367 |
· Transmitted Energy
( G .W. h
)
|
|
238.7 |
N.A
|
210.7 |
· Fuel Consumption
( g.m /
K.W.h )
|
|
530 |
N.A
|
667 |
· Peak Load ( M.W )
|
|
68 |
N.A
|
77 |
· Load Factor ( % )
|
|
72 |
N.A
|
81 |
· Capacity Factor
( % )
|
|
36.7 |
N.A
|
41.6 |
· Thermal Efficiency
( % )
|
|
98 |
N.A
|
98 |
· Availability ( % )
|
|
--
|
--
|
--
|
1995 / 1996
|
Generated
Energy
(G .W. h )
|
|
--
|
--
|
--
|
1996 / 1997
|
|
--
|
--
|
--
|
1997 / 1998
|
|
--
|
--
|
--
|
1998 / 1999
|
|
--
|
--
|
1206
|
1999 / 2000
|
|
--
|
--
|
3363
|
2000 / 2001
|
|
--
|
2441
|
3820
|
2001 / 2002
|
|
--
|
4469
|
3742
|
2002 / 2003
|
|
--
|
4821
|
3872
|
2003 / 2004
|
|
--
|
4749 |
3974 |
2004/2005 |
|
--
|
4847 |
3548 |
2005/2006 |
|
--
|
4574 |
3758.426 |
2006/2007 |
|
--
|
4582 |
4166 |
2007/2008 |
|
25
|
4908 |
4003 |
2008/2009 |
|
3140
|
4759 |
4527.3 |
2009/2010 |
|
|