|
Cairo Electricity Production Co .
|
Co .
|
|
3 units of steam turbines ,15
M.W
Installed Capacity , Duel Firing ( Ex.Gas-Mazzot ), Commissioned by 1958-59
(this station was terminated in 8/6/2005).
|
El Tebbin (St)
|
Description
|
|
2 units Of Gas turbines Each of 23 M.W Installed Capacity , Dual Firing ( Solar , NG ) ,
Commissioned 1979 .
(this station
was terminated)
|
El Tebbin (G)
|
|
El Tebbin (G)
|
El Tebbin
(St)
|
·
Generated Energy
( G
.W. h )
|
Statistics 2005/2006 |
|
41.684 |
202.139 |
|
36.838 |
185.814 |
· Transmitted Energy
( G
.W. h )
|
|
369.5 |
393.8 |
· Fuel Consumption
(
g.m / K.W.h )
|
|
38 |
38 |
· Peak Load ( M.W )
|
|
11 |
61 |
· Load Factor ( % )
|
|
9 |
50 |
· Capacity Factor
( % )
|
|
23.7 |
22.3 |
· Thermal Efficiency
( % )
|
|
-- |
96.6 |
· Availability ( % )
|
|
90
|
248
|
1995 / 1996
|
Generated
Energy (G.W.h)
|
|
93.5
|
236
|
1996 / 1997
|
|
37
|
241
|
1997 / 1998
|
|
73
|
259
|
1998 / 1999
|
|
53
|
244
|
1999 / 2000
|
|
10
|
232
|
2000 / 2001
|
|
7
|
111
|
2001 / 2002
|
|
34
|
257
|
2002 / 2003
|
|
8
|
121
|
2003 / 2004
|
|
36.838 |
202.139 |
2004/2005 |
|
41.684 |
-- |
2005/2006 |