|
Middle Delta Electricity Production Co .
|
Co .
|
|
Two combined cycle modules each contains(4 units of gas turbines each of
250 M.W
+ 2 HRSG turbine of 250M.W with total Installed Capacity of
1500M.W , Dual Firing (Solar- NG) , Commissioned in 2005 ,2006 .
|
Al Noubaria (1,2) |
Description
|
|
Two combined cycle modules each contains(1 units of gas turbines each of
250 M.W
+ 2 HRSG turbine of 250M.W with total Installed Capacity
500 M.W , Dual Firing (Solar- NG) ,Commissioned in 2009.
* The steam part
doesn't operate yet. |
Al Noubaria (3)
|
|
Al Noubaria (1,2,3) |
· Generated Energy ( G .W. h )
|
Statistics 2009/2010 |
|
11685.4 |
|
11514.8 |
· Transmitted Energy ( G .W. h )
|
|
181.2 |
· Fuel Consumption ( g.m / K.W.h )
|
|
1985 |
· Peak Load ( M.W )
|
|
67 |
· Load Factor ( % )
|
|
67 |
· Capacity Factor ( % )
|
|
48.4 |
· Thermal Efficiency ( % )
|
|
92 |
· Availability ( % )
|
|
--
|
1995 / 1996
|
Generated Energy
(G .W. h )
|
|
--
|
1996 / 1997
|
|
--
|
1997 / 1998
|
|
--
|
1998 / 1999
|
|
--
|
1999 / 2000
|
|
--
|
2000 / 2001
|
|
--
|
2001 / 2002
|
|
--
|
2002 / 2003
|
|
--
|
2003 / 2004
|
|
134 |
2004/2005 |
|
5203 |
2005/2006 |
|
8022.021 |
2006/2007 |
|
9636 |
2007/2008 |
|
10787 |
2008/2009 |
|
11685.4 |
2009/2010 |